Main Figures
Date of incorporation: 1972
Shareholdings:
– 60% Sociedad Estatal de Participaciones Industriales (SEPI)
– 40% Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT).
2017
Financial data in millions of €
Financial data
– Turnover | 291 |
– Amortizations & Provisions | 12 |
– Pre-tax P&L | 14 |
– After-tax P&L | 12 |
– Net Tangible Fixed Assets | 42 |
– Financial Debt | 130 |
– Total assets / liabilities | 497 |
More information about GRUPO ENUSA our annual reports
Fuel Assembly manufacturing, Juzbado
- 286.11 tons of uranium equivalent (tU) produced
- 739 fuel assemblies manufacture
- 523 for pressurized water reactors (PWR)
- 216 for boiling water reactors (BWR)
- 57% earmarked for export (France, Belgium, Sweden)
- 739 fuel assemblies manufacture
- More than 5 M€ investment to upgrade equipment and systems
Juzbado biogas Plant
– 10,219 tons of agricultural and livestock waste treated.
– 1,344,741 kWhe of renewable electric power generated.
– 1,713,629 kWht of energy supplied to the Juzbado Factory.
– 7,060 tons of liquid digestate used as liquid fertilizer in nearby fields.
– 3,388 hours of operation of the cogeneration unit.
Castellón USW Plant
– 89,865 tons of urban solid wastes managed in Zone 1 of Castellón.
ETSA
Completed expeditions:
-
- 49,244 shipments in the area of nuclear medicine, equivalent to 140,000 packages.
- 570 in relation to the nuclear industry (radioactive waste of low and intermediate-level and nuclear material with destination Spain and abroad).
<li1,119 of dangerous goods in tanks.